[ad_1]
Among the improvements made, the company said, was lifting the bridge at Black Bridge, near Machynlleth in Powys, away from a flood zone, improvements on the Conwy Valley line as well as installing 10,000 tonnes of rock to the side of cliffs along the Severn Estuary on the Cambrian line between Newport and Gloucester.
[ad_2]
Source link